<th id="jljdf"></th>
<span id="jljdf"><video id="jljdf"></video></span>
<progress id="jljdf"><noframes id="jljdf"><th id="jljdf"></th>
<span id="jljdf"><video id="jljdf"></video></span><th id="jljdf"></th>
<span id="jljdf"><noframes id="jljdf">
<span id="jljdf"></span>
<th id="jljdf"><noframes id="jljdf">
<strike id="jljdf"><dl id="jljdf"></dl></strike>
<span id="jljdf"><video id="jljdf"></video></span>
歡迎您光臨濟南蘇鑫電纜橋架有限公司網站!
聯系濟南蘇鑫電纜橋架有限公司 / Contact us

濟南蘇鑫電纜橋架有限公司

客戶咨詢熱線

0531-85767688

售后熱線:15668327566

聯系基地:山東省 德州市協同發展產業園D06幢

電纜橋架的安裝施工的步驟及相關注意事項!

文章來源:http://m.geteluoli.com/?? 作者:電纜橋架廠家發布時間:2023-06-27?瀏覽次數:42

返回:常見問題
設計規劃:在進行電纜橋架的安裝前,需要根據現場實際情況進行設計規劃。包括確定電纜橋架的類型、長度、寬度、高度、材質等,并繪制出詳細的施工圖紙。
Design planning: Before installing the cable tray, it is necessary to carry out design planning based on the actual situation on site. This includes determining the type, length, width, height, material, etc. of cable trays, and drawing detailed construction drawings.
材料準備:根據設計規劃確定所需的電纜橋架材料,如橋架、支撐、連接件、固定件等,并做好相應的采購準備工作。
Material preparation: Determine the required cable tray materials according to the design plan, such as trays, supports, connectors, fixtures, etc., and make corresponding procurement preparations.
施工準備:對施工現場進行準備工作,包括清理、測量、標線等。確保施工現場整潔有序,并遵守相關安全規范。
Construction preparation: Prepare the construction site, including cleaning, surveying, and marking. Ensure that the construction site is clean and orderly, and comply with relevant safety regulations.
安裝橋架:按照設計規劃將電纜橋架逐段進行安裝,先安裝主梁或直梁,再安裝串梁或托盤。根據需要,可以采用焊接、螺栓連接等方式固定橋架,并保證其穩定性和垂直度。
Installation of cable tray: Install the cable tray section by section according to the design plan, first installing the main beam or straight beam, and then installing the string beam or tray. According to needs, welding, bolt connection, and other methods can be used to fix the bridge and ensure its stability and verticality.
進行連接:在安裝橋架過程中,需要進行連接工作,確保橋架各部分之間的聯接牢固可靠。連接方式可以采用螺栓、焊接或夾緊等方法。
山東電纜橋架
Connection: During the installation of the bridge, it is necessary to carry out connection work to ensure that the connections between various parts of the bridge are firm and reliable. The connection method can use methods such as bolts, welding, or clamping.
進行支撐:根據需要,在橋架安裝過程中進行支撐工作。在長跨度或負荷較大的情況下,需要增加支撐桿或支撐架,確保電纜橋架的穩定性和承重能力。
Support: Support during the installation process of the bridge as needed. In the case of long span or large load, it is necessary to add support rod or support frame to ensure the stability and bearing capacity of cable tray.
固定與調整:完成電纜橋架的安裝后,需要對其進行固定和調整。確保橋架與其他設施之間的距離符合要求,并進行必要的調整,以保證電纜的通行暢順和安全性。
Fixation and adjustment: After the installation of the cable tray is completed, it needs to be fixed and adjusted. Ensure that the distance between the bridge and other facilities meets the requirements, and make necessary adjustments to ensure smooth and safe passage of cables.
完成驗收:安裝施工完成后,進行驗收工作。檢查電纜橋架的安裝質量和工程質量,確保符合相關標準和規范要求。
Completion acceptance: After the installation and construction are completed, acceptance work shall be carried out. Check the installation quality and engineering quality of cable trays to ensure compliance with relevant standards and specifications.
值得注意的是,在進行電纜橋架的安裝施工時,需要遵守相關的安全操作規范,并確保施工人員具備相應的知識和工作經驗。另外,根據具體情況可能還需要考慮防火、防腐等特殊要求。因此,在進行電纜橋架的安裝施工前,建議咨詢的電氣工程師或相關領域的專家。
It is worth noting that during the installation and construction of cable trays, it is necessary to comply with relevant safety operation regulations and ensure that construction personnel have corresponding professional knowledge and work experience. In addition, special requirements such as fire prevention and corrosion prevention may also need to be considered according to specific circumstances. Therefore, it is recommended to consult a professional Electrical engineer or experts in related fields before installing the cable bridge.
工程案例 / Case Show
  • 濟南火車站 濟南火車站
  • 曲阜孔子文化會展中心 曲阜孔子文化會展中心
  • 山東工藝美院 山東工藝美院
  • 公安廳服務展示 公安廳服務展示
国产无码一二三区,五月开心中文版在线观看,无码人妻精品一区二区蜜桃91,国内自拍视频一区二区三区,久久天天躁狠狠夜夜躁AV 亚洲AV永久无码精品网址 亚洲国产中文成人91 色8久久久噜噜噜久久 2021无码视频内射 国产精品成人无码a 亚欧美无遮挡hd高清在线视频 97色色亚洲色图 久久人妻无码系列 无码少妇一二三区免费