<th id="jljdf"></th>
<span id="jljdf"><video id="jljdf"></video></span>
<progress id="jljdf"><noframes id="jljdf"><th id="jljdf"></th>
<span id="jljdf"><video id="jljdf"></video></span><th id="jljdf"></th>
<span id="jljdf"><noframes id="jljdf">
<span id="jljdf"></span>
<th id="jljdf"><noframes id="jljdf">
<strike id="jljdf"><dl id="jljdf"></dl></strike>
<span id="jljdf"><video id="jljdf"></video></span>
歡迎您光臨濟南蘇鑫電纜橋架有限公司網站!
聯系濟南蘇鑫電纜橋架有限公司 / Contact us

濟南蘇鑫電纜橋架有限公司

客戶統一咨詢熱線

0531-85767688

售后熱線:15668327566

聯系基地:山東省 德州市協同發展產業園D06幢

環氧樹脂復合型電纜橋架的生產標準

文章來源:http://m.geteluoli.com/?? 作者:電纜橋架廠家發布時間:2023-09-13?瀏覽次數:3

返回:常見問題
樹脂配料→鋼板→玻璃鋼纖維布→模具→上夾具固化→脫模→切邊→修整→檢驗→入庫
Resin ingredients → steel plate → fiberglass cloth → mold → upper fixture curing → demolding → edge cutting → trimming → inspection → warehousing
1、首先要求模具清潔,場地清潔,工具清潔,其次要求車間通風,排風口應設在下方,送風口設在上方,車間通風:夏季溫度≤30℃,冬季溫度≥15℃,濕度≤75%。根據生產任務單規定的規格,準備好所需要的模具,準備工作包括:核對品種規格,清潔模具內臟及內模外表面。
1. Firstly, mold cleaning, site cleaning, and tool cleaning are required. Secondly, workshop ventilation is required, with exhaust outlets located below and supply outlets located above. Workshop ventilation: temperature ≤ 30 ℃ in summer, ≥ 15 ℃ in winter, and humidity ≤ 75%. Prepare the required molds according to the specifications specified in the production task order. The preparation work includes checking the variety specifications, cleaning the internal and external surfaces of the molds.
裁布:要求玻璃布不要受潮,不受污染。用剪刀或切割機裁剪玻璃布,要適應產品要求的鋪放方向:要求正反方向同性的制品,布要縱橫交替鋪放;要求一個方向機械強度高的FRP制品,可用單向布裁剪和鋪放。布要留有搭接余量,對壁厚要求均勻的制品可以對接,不論搭接或對接,接縫都要錯開。裁剪時,布要鋪平,布的大小,形狀由制品尺寸、性能及操作方便酌情處理。
Cloth cutting: It is required that the glass cloth should not be damp or contaminated. Using scissors or cutting machines to cut glass cloth, it is necessary to adapt to the laying direction required by the product: products that require the same direction in both directions should be laid alternately vertically and horizontally; FRP products with high mechanical strength in one direction can be cut and laid with unidirectional cloth. The fabric should have overlap allowance, and products with uniform wall thickness requirements can be connected. Whether overlapping or connecting, the joints should be staggered. When cutting, the fabric should be laid flat, and the size and shape of the fabric should be handled according to the size, performance, and ease of operation of the product.
2、配料:對所有配制的原材料,要有充分認識,明白各自的作用,做到不懂不配,不清楚不配,對所用容器做到一種顏色一種容器,嚴禁混合使用。根據產品的需要,在大的容器中放入樹脂、色漿、填料等,用機械攪拌,攪拌時間由攪拌效果決定。在大料中預先加入促進劑,配小料時再加固化劑;如果填料布含水量>1%,必須在1200烘箱中循環鼓風加熱2小時,冷卻至室溫后再用。
2. Ingredients: All prepared raw materials should have a full understanding and understand their respective roles, and be clear about whether they are compatible or not. The containers used should be of one color and one type, and mixing is strictly prohibited. According to the needs of the product, place resin, color paste, fillers, etc. in a large container and stir mechanically. The stirring time is determined by the stirring effect. Add accelerator in advance to the large material, and then add curing agent when preparing small materials; If the moisture content of the filler cloth is greater than 1%, it must be heated by circulating air in a 1200 oven for 2 hours, cooled to room temperature, and then reused.
3、玻璃鋼糊制:首先制作膠衣層,要求涂刷均勻。根據產品性能可用普通樹脂加入粉末填料來代替膠衣樹脂。膠衣層的制作,采用促進劑,固化劑的固化體系以增加制品柔韌性。
3. Glass fiber reinforced plastic pasting: First, make a gel coating layer, which requires uniform brushing. According to product performance, ordinary resin can be added with powder fillers to replace gel coat resin. The production of the gel coat layer adopts a curing system of accelerators and curing agents to increase the flexibility of the product.
待膠衣初凝,手感軟而不粘時,立即鋪層糊制,表層用薄布做表面層。制品厚度決定玻璃布的層數。增強層采用促進劑,固化劑的固化體系,來增加制品的強度。
濟南電纜橋架
When the gel coat is initially set and feels softbut not sticky, immediately lay a layer of paste and use a thin cloth as the surface layer. The thickness of the product determines the number of layers of glass cloth. The reinforcing layer adopts a curing system of accelerator and curing agent to increase the strength of the product.
4、復合:把糊制的玻璃鋼鋪層放入模具,用液壓機壓實固化,固化時間的長短根據環境溫度及固化劑的用量而定。
4. Composite: Place the pasted fiberglass layer into the mold, compact and solidify it with a hydraulic press, and the curing time is determined by the environmental temperature and the amount of curing agent used.
5、切邊:用脫模工具脫模,按規定尺寸切除毛邊。
5. Trimming: Use a demolding tool to demould and cut off burrs according to the specified size.
6、打孔:把切割的制品放在沖床上,沖連接孔。
6. Punching: Place the cut product on a punch and punch the connecting holes.
7、修整:因脫模造成膠衣剝落部分進行修整。
7. Repair: Repair the peeling part of the gel coat caused by demolding.
8、檢驗:外觀表面應平整、光滑、無氣泡、無裂紋、色澤要均勻,部件厚度應均勻,邊緣應整齊,不得有影響使用的缺陷。
8. Inspection: The appearance surface should be flat, smooth, without bubbles, cracks, and uniform in color. The thickness of the components should be uniform, and the edges should be neat without any defects that may affect their use.
9、包裝入庫:用草繩(或打包帶)把橋架包扎,入成品庫。
9. Packaging and storage: Wrap the bridge with straw rope (or packaging tape) and store it in the finished product warehouse.
感謝您的閱讀,此文的文章來源:山東電纜橋架更多的內容和問題請點擊:http://www.sdhangfeng.com我們會繼續努力的為您提供服務,感謝您的支持!
Thank you for reading. The source of this article is Shandong Cable Tray. For more information and questions, please click on: http://www.sdhangfeng.com We will continue to work hard to provide you with services. Thank you for your support!
工程案例 / Case Show
  • 濟南火車站 濟南火車站
  • 曲阜孔子文化會展中心 曲阜孔子文化會展中心
  • 山東工藝美院 山東工藝美院
  • 公安廳服務展示 公安廳服務展示
国产无码一二三区,五月开心中文版在线观看,无码人妻精品一区二区蜜桃91,国内自拍视频一区二区三区,久久天天躁狠狠夜夜躁AV 亚洲AV永久无码精品网址 亚洲国产中文成人91 色8久久久噜噜噜久久 2021无码视频内射 国产精品成人无码a 亚欧美无遮挡hd高清在线视频 97色色亚洲色图 久久人妻无码系列 无码少妇一二三区免费