<th id="jljdf"></th>
<span id="jljdf"><video id="jljdf"></video></span>
<progress id="jljdf"><noframes id="jljdf"><th id="jljdf"></th>
<span id="jljdf"><video id="jljdf"></video></span><th id="jljdf"></th>
<span id="jljdf"><noframes id="jljdf">
<span id="jljdf"></span>
<th id="jljdf"><noframes id="jljdf">
<strike id="jljdf"><dl id="jljdf"></dl></strike>
<span id="jljdf"><video id="jljdf"></video></span>
歡迎您光臨濟南蘇鑫電纜橋架有限公司網站!
聯系濟南蘇鑫電纜橋架有限公司 / Contact us

濟南蘇鑫電纜橋架有限公司

客戶統一咨詢熱線

0531-85767688

售后熱線:15668327566

聯系基地:山東省 德州市協同發展產業園D06幢

濟南復合電纜橋架鋪設

文章來源:http://m.geteluoli.com/?? 作者:電纜橋架廠家發布時間:2023-11-22?瀏覽次數:1

返回:公司新聞

濟南復合電纜橋架鋪設步驟:復合電纜橋架是一種用于電纜布線的支架系統,它由金屬框架和復合材料制成,具有較高的強度和耐腐蝕性能。以下是濟南復合電纜橋架鋪設的一般步驟:

Jinan composite cable tray laying steps: Composite cable tray is a support system used for cable wiring, made of metal frames and composite materials, with high strength and corrosion resistance. The following are the general steps for laying Jinan composite cable trays:

設計規劃:在進行復合電纜橋架鋪設之前,需要進行詳細的設計規劃,包括確定所需的長度、規格和鋪設方式等。

Design planning: Before laying composite cable trays, detailed design planning is required, including determining the required length, specifications, and laying method.

材料準備:根據設計規劃,準備好所需的復合電纜橋架材料,包括橋架、支撐件、連接件等。

20230310110134232.jpg

Material preparation: According to the design plan, prepare the required composite cable tray materials, including trays, supports, connectors, etc.

定位安裝點:根據設計規劃,在需要鋪設電纜的位置進行定位,并使用標尺和標記工具進行標記。

Positioning installation points: According to the design plan, locate the locations where cables need to be laid and mark them using rulers and marking tools.

安裝支撐架:首先安裝支撐架,支撐架用于固定和支持復合電纜橋架系統。根據設計要求,在標記的位置固定支撐架,確保其穩固牢固。

Installation of support frame: First, install the support frame, which is used to fix and support the composite cable tray system. According to the design requirements, fix the support frame at the marked position to ensure its stability and firmness.

鋪設復合電纜橋架:根據設計規劃,將復合電纜橋架放置在支撐架上,并使用連接件將各個橋架連接起來,形成連續的通道。

Laying composite cable tray: According to the design plan, place the composite cable tray on the support frame and connect each tray with connectors to form a continuous channel.

固定和調整:在鋪設過程中,確保復合電纜橋架的水平和垂直度,并使用固定件將其固定在支撐架上。

Fixation and adjustment: During the laying process, ensure the level and verticality of the composite cable tray, and use fixing parts to fix it on the support frame.

安裝配件:根據需要,安裝各種配件,如彎頭、橫向連接器、垂直連接器等,以滿足不同布線要求。

Installation accessories: Install various accessories as needed, such as elbows, horizontal connectors, vertical connectors, etc., to meet different wiring requirements.

檢查和測試:完成鋪設后,對復合電纜橋架進行檢查,確保其安裝牢固、無松動或變形,并進行必要的電纜拉線和測試工作。

Inspection and testing: After completion of laying, inspect the composite cable tray to ensure it is firmly installed, without looseness or deformation, and carry out necessary cable pulling and testing work.

工程案例 / Case Show
  • 濟南火車站 濟南火車站
  • 曲阜孔子文化會展中心 曲阜孔子文化會展中心
  • 山東工藝美院 山東工藝美院
  • 公安廳服務展示 公安廳服務展示
国产无码一二三区,五月开心中文版在线观看,无码人妻精品一区二区蜜桃91,国内自拍视频一区二区三区,久久天天躁狠狠夜夜躁AV 亚洲AV永久无码精品网址 亚洲国产中文成人91 色8久久久噜噜噜久久 2021无码视频内射 国产精品成人无码a 亚欧美无遮挡hd高清在线视频 97色色亚洲色图 久久人妻无码系列 无码少妇一二三区免费